Industrial flooring in Lima, Ohio

Grind and seal, polished concrete and epoxy floors for plants and warehouses. We quote multiple options, list the pros and cons of each, and help you choose.

Get flooring options

Or call Dustin: (614) 940-7928

02Floor refinishing options

We have the coatings you need to refresh your floors

Every space is different. Here’s how the three main options compare.

Grind & seal

The quickest way to clean up concrete when looks aren’t the priority. We rough up, densify, burnish and seal the floor, and patch gouges at the same time.

Best for
Fast cleanup
Downtime
Shortest
Most popular

Polished concrete

Durable, typically lower cost up front, and easy to clean and maintain. It shines without being slippery, and there’s no curing time.

Best for
Showroom look, low upkeep
Downtime
Short, no cure

Epoxy flooring

A synthetic, resin-based coating laid over concrete. It takes longer because of curing, but can last five to ten years.

Best for
Long-lasting coating
Lifespan
5–10 years
03Line striping

Our line striping is made to last

Lines painted on top of a floor fade quickly. We make striping part of the refinishing process instead:

  1. Grind the line into the concrete
  2. Apply epoxy paint
  3. Seal with a clear coat
04Timeline

Floor refinishing may take less time than you think

~1,000 sq ft

1–2 days

~5,000 sq ft

5–7 days

We can phase larger floors so production keeps moving in the areas we’re not working on.

Floor refinishing – afterFloor refinishing – beforeBEFOREAFTER
FREE · NO OBLIGATION

Get a free flooring assessment from Paramount

Weekend and third-shift slots book up first.

05FAQ

Industrial flooring questions

Straight answers from the Paramount team. Don’t see your question? Talk to Dustin, our owner, directly.

☏
CALL DUSTIN
(614) 940-7928

Polished concrete is usually lower cost up front, easier to maintain and needs no cure time. Epoxy takes longer to install but can last five to ten years. We quote both and walk you through the pros and cons.

Around 1–2 days for 1,000 sq ft and 5–7 days for 5,000 sq ft.

Yes. We patch gouges as part of the grind and seal process.

We grind the line into the concrete, apply epoxy paint and add a clear coat, instead of painting on top of the floor.